Projects-new

Filters M&P WATER Business Units
Filters M&P GROUP Business Units
a-1-300x300
CO2 footprints for 3 locations in Germany
a-4-300x300
CO2 footprints for 2 locations in Jena (D) and Jeřmanice (CZE)
Picture1_586x439-300x300
Deconstruction concept, tendering, supervision of pollutant clean-up, gutting, blasting, construction of excavation pit with special foundation engineering
a-2-300x300
CO2 footprint and ESG report for the group including approx. 10 independent GmbHs in Germany
a-7-300x300
Calculation of CO2 footprint Scope 1 / 2 / 3 , selection of suitable offset projects
Picture1
Expert opinion on the strengthening of the Rhine dams
Picture2
Expert opinion "Trees on and along dykes on the Neue Niers river
Picture3
Consultancy for the conceptual planning of the river channelisation of the Tumbes River
Picture4-1
Planning and consulting services for the hydraulic engineering implementation of the water discharge into the opencast mine
Picture5-1
Volkenbacher Weiher dam Expert opinion on the stability of the dam structure
Project_Marl-min-1
Flood protection and heavy rain concept for the METRO site of Goodman GmbH in Marl
Picture6
Damage repair of the Rhine dyke Wesel-BĂĽderich - Expert opinion
Picture7
HWSB Klietznick dike, km 37.0 - 38.865
Picture8
Modernisation of the former bowling alley into the Leipzig Museum of Natural History
a-5-300x300
Project management B-plan procedure "Semiramis industrial estate
a-3-300x300
Project development commercial park - Zum Schleusenpark, Datteln
Picture9
Office and laboratory building B1, berlinbiotechpark - excavation planning
Picture10
Framework contract for hydraulic engineering projects
a-7-300x300
Construction of a multifunctional sealing system at the Ihlenberg landfill site
a-1-300x300
Environmental due diligence ("quick check") for a land development near Hamburg
a-2-300x300
Approval procedure for the capacity expansion of a zinc smelter
Picture34-300x300-1 (1)
Central Station-Magdeburg "Ernst-Reuter-Allee
Picture33-300x300
Groundwater flow model Potsdam-Mitte
Picture32-300x300-1 (1)
Jänschwalde large-scale hydrogeological model
a-6-300x300
Wind farm Krummensee 3 - Hydrological report for early CEF measure
a-4-300x300
Surface sealing Duisburg Hochfeld
a-5-300x300
Kanonenberg landfill
a-3-300x300
Superstructure of Schleyerhofweg landfill site
flat-lay-hands-with-soil-copy-space-300x300
Self-monitoring of Castrop-Rauxel landfill
epoxy-paint-concrete-floor-water-proof-protection-industrial-warehouse-japan-300x300
Closure of former Colonia landfill and new development
Picture13-11-300x300
Extension, new construction and conversion measures, Wunstorf airfield
Picture13-12-300x300
Expansion of the Kiel Canal, test field exploration for explosive ordnance
Picture13-10-300x300
Grasbrook district development
Picture13-9-300x300
Versmannkai East, site clearance BF 102-110
Picture13-7-300x300
Conversion of the former BW Hospital Rostrup, Bad Zwischenahn
Picture21-300x300
Supplementary Detailed Investigation of the Contaminated Site Risk of the Hastedter Osterdeich Property in Bremen
Picture13-4-300x300
Orienting investigation (Phase IIa) of the Bad Arolsen site shooting range, Bad Arolsen
Picture13-3-300x300
Historical exploration of the former Kurhessen barracks, Hann. MĂĽnden
Picture13-2-300x300
Orienting investigation of old deposits in TĂĽndern
Picture13-1-300x300
Orienting investigations of the "Wustrow Z3" drilling mud pit
Picture3-1-300x300
BV Deconstruction Muskator Works DĂĽsseldorf
Picture1-300x300
BV Deconstruction Märkisches Zentrum Berlin