Client | Tierpark Rheinböllen GmbHHochwildschutzpark 1, 55494 Rheinböllen |
Performance period | 2023 - today |
Project | Tierpark Rheinböllen GmbH (TPR) is the operator and responsible for the maintenance of the Volkenbacher Weiher dam. Following a water inspection with the Lower Water Authority, Tierpark Rheinböllen GmbH was requested to submit a stability report for the dam of the Volkenbacher Weiher dam. Furthermore, the current condition of the dam is to be documented. Among other things, the operating company is also planning to further develop the use of the existing shore areas in the form of recreational areas and the implementation of further measures to optimise the future operation of the zoo. M&P Water GmbH also offers planning and consulting services for this purpose. TPR's goal is to be able to operate the zoo as sustainably and self-sufficiently as possible, which is why a conversion of the wastewater disposal and energy supply systems in particular is planned for the medium term. |
Engineering services | Geotechnical investigations, sampling, laboratory tests, determination of soil properties and embankment construction, surveyingGeotechnical verificationsInstallation inspection with photo documentation, basic evaluationEvaluation of the impact of the woody structures on stabilityStability verifications, summary reportPlanning services for the design of the riparian areasConsulting services for the sustainable operation of the zoo (wastewater disposal, water and energy supply) |