Project details
OFFICE AND LABORATORY BUILDING B1, BERLINBIOTECHPARK - CONSTRUCTION PIT PLANNING
Client | Argolon GmbHDraschwitzer Hauptstraße 11, 06729 Elsteraue |
Performance period | 2023 - today |
Project | According to the "Update of the subsoil expertise" for the present project, the excavation pit is to be water to be protected. As the bottom of the excavation pit is ~ 3.85 m below the highest expected groundwater level, the excavation pit must be made watertight. |
Engineering services | Consideration of sealing base variantsUnderwater concrete2. Underwater concrete with back anchoringBottom sealing made of Neutrogel® or similarDimensioning of dewateringDetermination of the water volume to be pumped as pumping rate and total pumping volumeNumber of pumps incl. pumping capacityArrangement of the required pump sumps / wells incl. entry in the construction pit planShort report |