Flood protection, Heavy rain management

Consultancy for the conceptual planning of the river channelisation of the Tumbes River

Project details

ClientBesalco Stracon ConsortiumAv. Paseo de la Republica No: 3245 Piso 17San Isidro Peru
Performance period2022 - today
ProjectThe Besaclo Stracon consortium has been awarded the contract for a design and construction project for the river engineering works along the Tumbes River in Peru. The project covers approximately 30 miles of the lower section of the river, of which the mouth ends in the Pacific Ocean, and the consortium prepared the design including various options/alternatives. The services are to include stabilisation of the river, upgrading of the river, flood protection, dykes, etc.
Engineering servicesSite visitReview and improvement of the overflow concepts along the river proposed by the CBS project teamPlanning of overflow dikesPresentation of results and alternatives

SIMILAR PROJECTS

Picture1
Expert opinion on the strengthening of the Rhine dams
Picture2
Expert opinion "Trees on and along dykes on the Neue Niers river
Picture4-1
Planning and consulting services for the hydraulic engineering implementation of the water discharge into the opencast mine